Case Studies
Which application are you interested in?
Protection of Pier Foundation of Zhongsha Bridge at Zhuoshui River, Changhua, Taiwan
Taiwan | 2015-2019
Products:ACETube® - hydraulic structures, ACEFormer™
Application:Revetments ,Pier Scour Protection System
Application:Revetments ,Pier Scour Protection System
Restoration of No. 6 Groin with ACETube®, Gaoping River Weir, Taiwan
Taiwan | 2015-2019
Products:ACETube® - hydraulic structures
Application:Wing Dams / Groynes
Application:Wing Dams / Groynes
Riverbank Erosion Control, Zhuoshui River, Changhua, Taiwan
Taiwan | 2015-2019
Products:ACETube® - hydraulic structures, ACEFormer™
Application:Levees and Dikes ,Revetments ,Wing Dams / Groynes ,Pier Scour Protection System
Application:Levees and Dikes ,Revetments ,Wing Dams / Groynes ,Pier Scour Protection System
The Multifunctional Uses of ACEBag™ for Dredged Soil Containment and Cofferdam Construction, Nantou, Taiwan
Taiwan | 2010-2014
Products:ACEBag™
Application:Sediment Dredging ,Levees and Dikes
Application:Sediment Dredging ,Levees and Dikes
River Bank Protection, Kuanionkong Stream, New Taipei, Taiwan
Taiwan | 2005-2009
Products:ACEBag™
Application:Revetments
Application:Revetments