News
Congratulations! ACE Was Awarded in Case Competition and IGS Young Members Photo Contest in GeoAsia7 2022
"News"

At the grand opening ceremony of GeoAsia 7, it's a great honor for our general manager, Amie Wang cuts the ribbon on the opening of GeoAsia 7. She addresses and wishes the event success on behalf of ACE Geosynthetics. Even if the covid-19 breaks the order and attacks the world, these will go through, and we will reunite!





In the seminar, we successfully completed the publication of the two articles, which were highly affirmed. And ACE won in the case competition-ACEGrid® Reinforced Earth Containment Structure for Abutment Seismic Protection in Taiwan. ACE will represent Asia to participate in the final competition at the 12th ICG in Rome. Just like the name of ACE, our professional excellence has been proved in this event. Also, we won third place in the IGS Young Members Photo Contest.

Starting from a material manufacturer, ACE not only continues to strengthen product R&D and quality, but also develops diversified and professional technical services, and establishes its international certification laboratory. We actively promote it in this era of net zero and provide solutions that are reliable and contribute to significant carbon reductions. Sincerely hope that more companies can feel our passion and efforts, and we could have further cooperation on geosynthetics to make the world better!
For people who come or do not come to the GeoAsia 7, we make a video to capture the highlights of the event. Let’s review it.
Video
Use Geotextile Mattress (ACEFormer™) to Protect Severely Eroded Riverbank

Irrawaddy River is the largest and most vital commercial waterway in Myanmar where many villages live along its stream; however, the same villages are threatened by inundations every year’s rainy season.
Obstacles are as followed:
1. A steep and long (about 30 m) riverbank slope needed protection from intensive erosion.
2. Erosion holes existed on the curved section of the riverbank.
3. The river’s deep-water level and strong currents increased construction difficulty.
4. The construction period was limited to three months and the budget was tight.
The ACEFormer™ filled with cement mortar enhances the overall structure’s stability and erosion control. From design to installation, our team is concerned with every single step. The ACEFormer™ still stands and remains intact after several rainy seasons upon the project completion.
Please refer to the latest uploaded information and files on the official website below, and feel free to contact us for further details.
Case Studies
ACE Solutions in Transportation GeotechnicsThere are four applications- subgrade stabilization, base reinforcement, pavement improvement, embankment and abutment construction- with several cases and eight products introduced.
To be a member, visit the page to apply for an account.
To learn our exclusive designed services for our online members, please click here.
Similar News
ACE Geosynthetics Showcases Eco-Friendly Solutions at INTERPRAEVENT 2023 International Symposium in Taichung
"News" The INTERPRAEVENT 2023 International Symposium recently took place in Taic...
Visit ACE Geosynthetics at GeoAsia7 2022 in Taipei, Taiwan
ACE Geosynthetics is excited to attend the 2022 GeoAsia7 Conference & IGS First Young Engineers...

