Geogrid1-Reservoir Accesing Road Construction |
|
| |
 |
Owner |
| |
Pau-Zsan, Shing-Zu County, Taiwan (Pau-Zsan II Reservoir) |
|
| |
 |
Project location |
| |
North Region Water Resource Office, Water Resource
Agency, Ministry of Economics Affairs |
|
| |
 |
Project period |
| |
3 years |
|
|
|
|
|
 |
 |
 |
Specification |
| |
| Item |
ACEGrid® GG150-1 |
ACEGrid® GG200-1 |
| Material |
Polyester (PET) Geogrid |
| Tult (kN/m) |
150 |
200 |
| Elongation(%) |
≦11% |
≦12% |
| Strength@5% strain(kN/m) |
≧75 |
≧100 |
| Junction Strength |
≧61.5 kg |
≧61.5 kg |
| Width |
3.8 m |
3.8 m |
|
|
 |
 |
 |
Project Profile |
| |
The Accessing road is constructed along the mountain ridge and the total length is 8km. Partial of the earth-fill slopes use the reinforced embankments. This road also includes three bridges. Because the difficulty of the construction, that is changed to totally use the reinforced embankments. The total number of the reinforced retaining walls is sixteen, which are built with steel grill reinforced façade, and the height is form 2m to 14m. After the typhoon attack in 2004, there was no damage for the reinforced retaining walls in this project although the Shing-Zu area was seriously destroyed by the typhoon.
Consequently, the landslides are rehabilitated by the reinforced
|
|
 |
| |
retaining wall as well. This rehabilitation project includes two reinforced retaining wall with geogrid
wrap-around façade. |
|
|
|
 |
ACE Geosynthetics |
| |
|
|
| |