Reclamation Works

  • Performance
  • Products
  • Docs

In land reclamation work, ACETube® is stacked as a cofferdam in the predetermined position, and then the reclamation dike is filled by dredged material such as sand etc. In order to reduce differential settlement, ACETex® can be applied to stabilize the soft soil. ACETube® provides fast, handy and cost effective construction method to create not only new land, but also wetlands and lagoons for biodiversity habitat.