Home
Русский
Français
Español
Contact Us
Site Map

APPLICATION

Home > Application > Application - Marine Enginnering > Installation
Tube installation for applications in marine engineering

Tube can be applied as a result of breakwater, coastal protection, beach nourishment, etc. Therefore the construction method will adapt the environmental condition. Generally speaking, the installation sectors can be divided into two: in-land or submerged. Hereby we will demonstrate the in-land installation procedure of tube application. For more information of submerged installation guidance, please contact ACE Geosynthetics.

The Process of ACETube® installation
Step 1: Construction site preparation.
Step 2: Placing the ACETube® on the correct location of design.
Step 3: Connect pipe with filling port.
Step 4: Filling the ACETube® with dredge equipment.



Step 5: Complete the filling.
Installation Video of ACETube®
For more information kindly contact ACE: sales@geoace.com
  Previous page
 
ACEGrid®Geogrid ACETex®Geotextile ACEBag ACETube® ACEFormer ACEContainer ACEGeogabion
Home About Us Products Applications Technical Info News & Events Contact Us Site Map
go to top

Terms&Conditions | Copyright | Copyright © 2008 ACE Geosynthetics. ALL RIGHTS RESERVED.

Geosynthetic / Geogrid / Geotextile